Commissioning of electrical power systems is important because most electrical failures often occurs as catastrophic events and are not detected until a fault or failure occurs.
Lightning protection system testing and commissioning.
Earthing and lightning protection systems.
Scribd is the world s largest social reading and publishing site.
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning testing commissioning of lightning protection system through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level.
However it is also critical that commissioning and routine testing is undertaken.
Download method statement for testing commissioning of lightning protection earthing system now you can download method statement itp testing commissioning checklists and risk assessment for lightning protection earthing system by paying a very nominal fees.
3 2 2 testing of high voltage h v installations cop code 21d 19 3 3 functional test of system equipment 20 3 3 1 lightning protection system 20 3 3 2 circuitrycheck 20 3 3 3 charger and batteryset 20 3 3 4 lighting installation 21 3 3 5 digital multifunction power meter 22 3 3 6 digital power analyzer 23 3 3 7 busbar trunking system 23.
Lightning protection systems in tandem with the earthing system dissipates and controls lightning strikes and other over voltages that may adversely affect the transmission system.
Standard for commissioning of fire protection and life safety systems developed in response to a request from the national institute of building sciences nibs nfpa 3 outlines the commissioning process and integrated testing of fire protection and life safety systems to ensure systems perform in conformity with the design intent.
7 33 the earth electrode for the lightning protection system shall be connected below ground level to the earthing system earth pit through single core copper pvc sheathed cable as per spec.
The files are in word excel format and instantly available after you pay the cost of only 2 99.
Electrical systems providing energy to all the systems in building including hvac lighting security safety communication and monitoring systems.
The fundamental purpose of an earthing system is to provide a safe return path for fault currents.
7 34 after completion of installation and testing final connections shall be made after ensuring proper cleaning as per spec sections.
The files are in word excel format and instantly available after you pay the cost of only 2 99.
When an earth fault strikes on a high voltage system the fault current generates a voltage at the source of the fault.